Comprehensive Analysis of the Internal Control System within LSGs in Armenia

Scope of the Project

The project encompasses a comprehensive evaluation of the internal control system within the targeted entity. Key components of the scope include:

  • Implementation of a Baseline Assessment: Conducting a thorough analysis of the existing internal control framework to establish a reference point for future improvements.

  • Adequacy Assessment Against Business Processes: Evaluating how well the current internal controls align with and support existing business processes and operational realities.

  • Identification of Gaps and Design Deficiencies: Pinpointing weaknesses or inefficiencies in the design and structure of the internal control system that may hinder its effectiveness.

  • Improvement Recommendations: Developing practical, tailored recommendations for strengthening the internal control system, grounded in leading European and international standards and aligned with ongoing Public Financial Management (PFM) reforms in Armenia.

14%
portion of total synergy savings derived from IT consolidation

Explore Other Successful Projects